Kategorien

First train arrives at Stockholm Norvik Port


Photo: Port of Stockholm

The first Green Cargo train arrived at Stockholm Norvik Port on Tuesday (9.6.2020) on the newly built industrial branch line.

 

Ports of Stockholm built the just over 4 km industrial branch line to couple Stockholm Norvik Port to the Swedish railway network; an investment of SEK 800 million (EUR 76 millon).

 

Besides the 440 m long branch section, the industrial line includes an additional 360 m of track on the port esplanade, a railway yard with three 750 m long tracks as well as a 100 m long siding. Ports of Stockholm owns, and is responsible for, the operation of the branch line. (ben)

www.portsofstockholm.com.se