Kategorien

Intermodal terminal to double capacity


Photo: Cando Rail

The rail and terminal service provider Cando Rail is expanding its Sturgeon multi-purpose rail terminal in Alberta, Canada. This will double the size of the facility, transforming it into a rail-centric supply chain hub with the capability to stage, receive, and dispatch long unit trains.

 

The chemical manufacturer Dow will be an anchor tenant in the expanded terminal, which will have the capacity for up to 2,500 new railcar storage spaces in a storage-in-transit yard, and additional car capacity of up to 1,150 spaces on arrival/departure tracks – including the availability to stage 12,000-foot unit trains. Cando will complete engineering design by the end of 2024 and plans to start construction in Q2/2025. (ben)

www.candorail.com